Building

Method

How to Build

1-White blocks should be sprayed with water before use to be wet during construction.

2-The walls should be sprayed with water three consecutive days twice a day after construction, especially on hot days.

3-To ensure thermal insulation is completed, the Shamlan has a ready-to-use armed door for door and window openings as required.

4-Used mortar:

  • Regular mortar
  • Regular mortar with lime
  • Shamlan mortar